Headquarter Holz Binder

Headquarter Holz Binder, Fügen

Owner: Binderholz GmbH
Customer: Ing. Hans Lang GmbH
Construction period: 06.2007 – 07.2007
Order value: € 270,000

Project description:
Installation of a water-tight excavation pit using jet-grouting, securing the floor plate from buoyancy using GEWI piles.

Geology / Hydrology:
Sand, gravel, stones – groundwater from 2.00 m below top ground surface.

Technical Data:
880 metres jet-grouting columns, 1,020 metres GEWI piles
(220 m GEWI d = 40 mm, 410 m GEWI d = 50 mm, 390 m GEWI d = 60 mm)
70 m short-term pre-stressed anchor , 300 kN

Special features:
Working in the immediate vicinity of the factory buildings while maintaining traffic at the plant site. Working near the Zillertal Railway lines.